Completion String Design

  • Evaluation of the completion design early in a development project is very important to the project’s success.
  • Ensures that the proper completion tubular is recommended if pressure-rating is required and is available when operations commence.
  • Evaluates a completion string design for the provided well path and completion fluid properties in different operational modes such as ROB, TIH, POOH, etc.;
  • Ensures a completion string can meet the mechanical loads of the actual drilled trajectory with the actual casing ID.
  • Optimizes on critical parameters.
  • Sensitizes on certain variables.